|
No. |
The main point |
Notes |
|
|
1. The cost of transportation |
|
|
1 |
Land transportation |
Shuohuang and Huangda railway , road cross in the city by two high speed road including Shihuang , Jinshan and two national road 205 and 307. 120 km away from Tianjin, 230 km away from Beijing.It only take 5 hours to Shuozhou by Shuanghua railway. And 18 hours to Shantou by Jinshan high speed road. |
|
2 |
Sea transportation |
Huanghua port, which is located at 42 km east of the city, is a comprehensive port for coal and chemical products and container. It can get to all the port of the world. |
|
3 |
By Air |
It will take 1.5 hours to the airport of Tianjin. 3 hours to Beijing airport or Shijiazhuang airport. |
|
|
2. The cost of land |
|
|
4 |
The situation of the land |
There are rich land resources in the city. |
|
5 |
The price of land-remising |
Generally, the price is about 30-40 thousand Yuan . Negotiable |
|
6 |
The using right of the land (term limit) |
50 year for land in industry; 50 years for comprehensive using land. 40 years for commerce land; 70 years for residence land |
|
7 |
The using fees of the land |
Can be exempted or reduced according to the situation |
|
|
Construction cost |
|
|
8 |
The intensity of the level layer |
6-10 ton/ square meter |
|
|
|
|
|
9 |
The supervisor fees of the construction quality |
2.45 percent of the amount of the contract |
|
10 |
Cube rate of the construction |
0.5-1.2 |
|
11 |
The density of the construction |
Less than 27 percent |
|
12 |
Virescence rate |
20 percent for industry, 35 percent for residence |
|
|
The cost of the energy resources |
|
|
13 |
The power supplying |
Two powder net in the city. The supplying capacity is 1400 million KWH. The extra of 1000 million KWH is available |
|
14 |
The low-pressure power supplying |
The transformer equipments are prepared by the enterprises themselves. |
|
15 |
The price of the power |
For less than 315 KW, 0.5973Yuan / KWH for the industry, 0.6473Yuan / KWH for lighting; for more than 315 KW, 0.4353Yuan/ KWH for industry, 0.6473Yuan/ KWH for lighting, base cost of 18Yuan / KW is added monthly. |
|
16 |
Water Supply |
Equipped with running water net, and the daily supply of 30 thousand tons is available. |
|
17 |
Water Fee |
RMB3.30/m3 |
|
18 |
Emit Pollution Charges |
Surpassing the set standard: RMB0.70/
Sewage treatment:
Manufacture: RMB0.40/T
Life: RMB0.30/T
Service running: RMB0.50/T
Special line: RMB0.55/T |
|
19 |
Telephones Installing Charges |
No the original installing charges, but RMB158.00 will be pay for the labor and materials per unit. |
|
20 |
Wide band |
Y |
|
|
Labor Cost |
|
|
21 |
Workers Salary |
Monthly salary: RMB500-700 one person |
|
22 |
Staff Salary |
Monthly salary: RMB500-900 one person |
|
23 |
Manager Salary |
Monthly salary: more than RMB1200 one person |
|
24 |
Employment Guarantee |
Signing the employing contract |
|
25 |
Labor Insurance |
Endowment insurance: the company is bear of 20 per cent of the salary and the employee pay for 8 per cent.
Unemployment insurance: the company is bear of 2 per cent of the salary and the employee pay for 1 per cent.
Medical and Healthy insurance: the company is bear of 6 per cent of the salary and the employee pay for 2 per cent.
Industrial Injury and childbearing insurance: the company is bear of 1.2-1.4 per cent of the salary. |
|
|
Others |
|
|
26 |
Enterprise Registration Charges |
0.08 per cent will be charged if the registered capital is less than RMB10.00 millions; 0.04 per cent will be charged if more than RMB10.00 millions; the charge will be free when the registered capital is equal or more than RMB100.00 millions and the least fee is RMB50.00 |